Architect: B+H Architects
Contractor: PCL
Trillium is a provider of the totalopeningsolutions® to this LEED Silver base-building research tower, located in the heart of downtown Toronto and the newest addition to the MaRS Centre.
MaRS Phase 2 will add 770,000 sq. ft. to the Centre, more than doubling the available square footage of MaRS, and creating Canada’s largest science, technology and research centre.
The project includes over 650 hollow metal doors and frames, and 2 sets of stainless steel openings at the TTC’s Queen’s Park subway connection, all supplied and installed by Trillium.